4th Water Storage Tank and Booster Pump Station Modification
PrōVen provided an eight-million gallon water storage tank and installed solenoid pilot valves on each of the existing three tanks; constructed new pavement and driveway, fencing, landscaping, and landscape irrigation. The Booster Pump modifications included 24-inch suction manifold replacement, new gate valves, a new sump pump with valve and dicharge piping, and installed electrical service to the Booster Pump station from existing PG&E transformer, two new 125 HP variable frequency drive electric motors and pumps. ProVen also removed and replaced two 24-inch gate valves, two 20-inch gate valves and one 16-inch gate valve.
Location
3420 East Third Avenue, Foster City, CA
Start Date
June 2004
Completion Date
November 2005
475 calendar days
Original Contract
$8,233,184
Final Amount
$8,261,508
Owner
City of Foster City
610 Foster City Boulevard, Foster City, CA 94404
Alan Shu
650-286-3271
[email protected]
Engineer
Brown and Caldwell
201 North Civic Drive, Suite 115, Walnut Creek, CA 94596
3420 East Third Avenue, Foster City, CA
Start Date
June 2004
Completion Date
November 2005
475 calendar days
Original Contract
$8,233,184
Final Amount
$8,261,508
Owner
City of Foster City
610 Foster City Boulevard, Foster City, CA 94404
Alan Shu
650-286-3271
[email protected]
Engineer
Brown and Caldwell
201 North Civic Drive, Suite 115, Walnut Creek, CA 94596