Environmental Restoration
From water recycling programs like the Southbay Recycling Program in San Jose to irrigation district fish screen intakes such as our work for the Patterson Irrigation District in Northern California, ProVen serves the environmental restoration, preservation and sustainability efforts of public utility districts.
Construction on Napa Creek Site
This project, which occurs throughout residential and business areas of Napa, California, required great sensitivity to the local residents while maintaining water quality in the Napa Creek and the Napa River. Extensive shoring was utilized in order to protect buildings adjacent to the project with a close adherence to vibration limits. Streambed restoration of Napa Creek was central to the project and involved the reconstruction...
This project, which occurs throughout residential and business areas of Napa, California, required great sensitivity to the local residents while maintaining water quality in the Napa Creek and the Napa River. Extensive shoring was utilized in order to protect buildings adjacent to the project with a close adherence to vibration limits. Streambed restoration of Napa Creek was central to the project and involved the reconstruction...
South Bay Water Recycling Program SJ 11 - Zone 3 Reservoir and Pipeline Project
PrōVen installed 5,000 LF of 24" diameter restrained pipe, connected it to the existing pipe at the intersection of Villa Vista Drive and Yerba Buena Road. PrōVen also installed 820 LF of 12" diameter pipe and portable water service assemblies with vaults and valves, 600 LF of 18" diameter pipe, and two 18" recycled water service assemblies at...
PrōVen installed 5,000 LF of 24" diameter restrained pipe, connected it to the existing pipe at the intersection of Villa Vista Drive and Yerba Buena Road. PrōVen also installed 820 LF of 12" diameter pipe and portable water service assemblies with vaults and valves, 600 LF of 18" diameter pipe, and two 18" recycled water service assemblies at...
Priest Reservoir Bypass Pipeline
The Priest Reservoir project was completed in 42 days. During the construction of this project all water from the Sierra was shut down to the Bay Area. This was a very important project for the SFPUC as a delay could have resulted in severe water shortages to the Bay Area. PrōVen received a bonus for completing the project within schedule and 10 days earlier than expected. PrōVen performed tunneling, rock...
The Priest Reservoir project was completed in 42 days. During the construction of this project all water from the Sierra was shut down to the Bay Area. This was a very important project for the SFPUC as a delay could have resulted in severe water shortages to the Bay Area. PrōVen received a bonus for completing the project within schedule and 10 days earlier than expected. PrōVen performed tunneling, rock...